Mobile Alerts  Newsletter  RSS  Archives  About Us  Bookmark Us  Twitter GMANews.TV
National

Group calls for temporary suspension of NorthRail project

Email the Editor Print | | More
MANILA, Philippines - Pending the resolution of controversies surrounding the multimillion-dollar North Luzon Railways Corp. (NorthRail), nongovernmental group Freedom from Debt Coalition (FDC) on Monday pushed for its temporary suspension.

On the sidelines of a forum, FDC Vice-President Lidy Nacpil told BusinessWorld, "The very least and prudent thing [for the government] was to suspend it in view of the investigation in the Senate and the hanging questions."

Last week, the Bangko Sentral ng Pilipinas signed a supplemental $90-million facility from London-based Barclays Bank Plc. to finance NorthRail’s phase 1, sections 1 and 2.

Ms. Nacpil said internal investigations conducted by the consumer and advocacy group showed two major issues against NorthRail: overpricing and displacement of settlers.

The FDC is also questioning the technical competence of the project’s contractor, China National Machinery and Equipment Corp.

Ms. Nacpil claimed the $503-million project was overpriced by around $70 million, but the group stopped short of detailing the overpriced amount.

NorthRail as well as its parent, Bases Conversion and Development Authority could not be reached for comment.

No irregularities

Meanwhile, Transportation Undersecretary Guiling A. Mamondiong said there are no irregularities in the supplemental funding.

"If its part of the financing allowing the project to proceed... there’s nothing wrong about it," he said in a telephone interview.

The 80-kilometer (km) railway system runs from Caloocan City, Metro Manila to Clark Field, Pampanga.

The project’s 32-km stretch from Caloocan to Malolos involves construction of train stations in Valenzuela, Marilao, Bocaue, Guiguinto and Malolos.

The remaining stretch will extend to the Diosdado Macapagal International Airport in Pampanga.

The FDC also claimed the $932.037-million South Luzon Railways project or SouthRail was also overpriced by about the same amount as NorthRail’s.

Again, the group did not disclose the details. The two-phase 558-km SouthRail stretches from Calamba, Laguna to Matnog, Sorsogon. — Marian Grace S. Ramos, BusinessWorld
Email the Editor Print | | More
Other Nation stories
Erap forms legal panel to defend his 2010 poll bid vs disqualification
11/21/2009 | 05:55 AM
Former President Joseph Estrada on Friday said he has increased the number of legal luminaries that would defend his second attempt to win the presidency from possible disqualification complaints. More
Erap airs his pro-jueteng agenda on GMANews.TV's ‘Examine’
11/21/2009 | 05:09 AM
Former president Joseph Estrada renewed his call for the legalization and social acceptance of jueteng, the underground "poor man's gambling game" that may forever be associated with his... More
Attacks get nasty as Noynoy maintains high survey ratings
11/21/2009 | 05:08 AM
Pag hitik ang puno, binabato ang bunga. (Kids throw stones at a tree heavy with fruit.) Noynoy Aquino is now the tree heaviest with fruit. As he consistently tops public opinion surveys, the more... More
Pinoys join Raise your Voice campaign on climate change
11/20/2009 | 07:37 PM
A six-minute amateur video featuring dramatic footage that showed the devastation caused by tropical storm Ondoy is the lone Philippine entry in a YouTube campaign to raise awareness on the issue... More
'Suspect in Ebarle slay was in 2004 car accident that killed a Palace exec'
11/20/2009 | 04:41 PM
The man suspected to have shot the son of a ranking Palace official during a traffic altercation last Wednesday had been involved in a car accident five years ago that resulted in the death of,... More
Detained Brig. Gen. Danny Lim joins LP senatorial slate
11/20/2009 | 03:52 PM
Detained Brig. Gen. Danilo Lim, the bemedalled former chief of the Scout Ranger Regiment accused of launching a coup against the Arroyo administration, will join the senatorial race in the 2010... More
Jinggoy won't run as Villar's guest senatorial candidate
11/20/2009 | 03:02 PM
Senate President Pro Ttempore Jinggoy Estrada has turned down the offer of the Nacionalista Party to become its guest senatorial candidate. More
Noynoy tops polls again, this time in Davao City, Batangas
11/20/2009 | 01:45 PM
He is on top again, this time in Davao City and Batangas province, enjoying a consistently wide margin over his opponents. Results of recent surveys conducted in the said areas show that Noynoy... More
Arroyo spokesman quits post, prepares for congressional bid
11/20/2009 | 12:56 PM
Anthony Golez Jr, the deputy spokesman of President Gloria Macapagal Arroyo, has formalized his resignation from his post, radio dzBB's Tuesday Niu reported on Friday. More
Marcos family formalizes support for Manny Villar
11/20/2009 | 12:55 PM
The children of the late strongman Ferdinand Marcos on Friday formalized their support for the May 2010 bid of Senator Manuel Villar Jr. as the once mighty Kilusang Bagong Lipunan (KBL) entered... More
ADVERTISEMENT
Arroyo govt failed to create the millions of new jobs it promised
2009-11-19 21:36:55
The Arroyo administration was unable to create the millions of jobs it promised to generate...
Obama names first African-American envoy to RP
2009-11-20 13:09:42
America's first African-American president, Barack Obama, has named the first...
Oprah Winfrey to announce show will end in 2011
2009-11-20 07:56:57
(Updated 10:32 a.m.) CHICAGO — "The Oprah Winfrey Show," an iconic broadcast that grew...
Suspected US drone strike kills 3 in Pakistan
2009-11-19 12:44:12
MIR ALI, Pakistan — Intelligence officials say missiles fired from a suspected US drone have...